UNIVERSITY OF CALIFORNIA - SAN DIEGO
SAN DIEGO CA
CSC Building: 220Kw STC
|
Hopkins Parking Structure: 275 Kw STC
|
- Photovoltaic system size campus wide – 3.2 Megawatts (proposed) STC
- System currently designed and under construction – 1.2 Megawatts STC
This project is one of 6 separate roof top installations designed by TANNER ENGINEERING and currently under construction at the campus and scheduled to be completed by 11/31/2009. This system is part of the campus-wide installation using low-profile module/racking systems, coupled with a high-efficiency system that can be repeated at each location.