UNIVERSITY OF CALIFORNIA - SAN DIEGO

SAN DIEGO CA

County of Solano Government Center County of Solano Government Center

CSC Building: 220Kw STC

  • 1073 Kyocera (KD205GX-LP) modules
  • 3 – Xantrex GT100 Grid Tied Inverter

Hopkins Parking Structure: 275 Kw STC

  • 1350 Kyocera (KD205GX-LP) modules
  • 2 – Xantrex Grid Tied Inverters 9100Kw & 225Kw

- Photovoltaic system size campus wide – 3.2 Megawatts (proposed) STC

- System currently designed and under construction – 1.2 Megawatts STC

This project is one of 6 separate roof top installations designed by TANNER ENGINEERING and currently under construction at the campus and scheduled to be completed by 11/31/2009. This system is part of the campus-wide installation using low-profile module/racking systems, coupled with a high-efficiency system that can be repeated at each location.