SYCUAN HOTEL AND CASINO

EL CAJON CA

TANNER ENGINEERING is currently engaged in strategic master planning of distributed site electrical utilities and opportunities for large scale Photovoltaic systems that will serve to offset the large electrical demands of the casino. Under current study is study of a 5 megawatt solar carport design for the top deck of a new 5 level parking structure, and integration of a co-generation central plant to serve proposed new structures at the site.

Long-term planning is inclusive of distributed generation of solar tracking farms that will serve the greater community and facility operations buildings, with full systems sizing at up to 5MW of alternative power generation.